Summary
Construction is now almost complete with the remaining jobs expected to be finished by September 2007.
A number of changes are being made to reduce speed and improve pedestrian links. These changes include:
- construction of kerb extensions
- alterations to road markings
- give way or stop controls at uncontrolled intersections
- installation of driver feedback signs
The consultation for the proposed 40km/h speed restrictions, planned for early 2008, has been deferred.