|
In Stage 4: Implementation
Summary
In 2003/04, Wellington City Council consulted with the public on a variety of proposed roading changes in Tawa, including possible speed limit changes and construction work. The construction work was carried out in 2004/05.
A proposal to lower the 40 km/hr speed limit has been deferred.
Progress
Department Details:
Infrastructure
|